1117-v4 |
MQXFS1 Fabrication Report |
Giorgio Ambrosio et al. |
Design & Analysis
|
22 Aug 2017 |
1143-v1 |
Fabrication of First 4-m Coils for the LARP MQXFA Quadrupole and Assembly in Mirror Structure |
Giorgio Ambrosio et al. |
Coil
Mirror structure
IRUpgrades
|
17 Jan 2017 |
1074-v5 |
MQXFS1 Design Report |
Giorgio Ambrosio et al. |
Design & Analysis
Magnets
|
14 Apr 2016 |
1096-v1 |
Test Results of the LARP Nb3Sn Quadrupole HQ03a |
Giorgio Ambrosio et al. |
Test & Instrumentation
Test results
|
23 Dec 2015 |
1087-v1 |
LARP MQXFSM1 (Mirror) Magnet Test Summary |
Giorgio Ambrosio et al. |
Mirror structure
Test results
|
04 Nov 2015 |
1070-v1 |
Proposed US Contributions to LHC High Luminosity Upgrade |
Oliver Bruning et al. |
General
|
11 Feb 2013 |
1068-v1 |
Strategic Plan for the LHC Accelerator Research Program |
Giorgio Ambrosio et al. |
Collaboration
|
14 Aug 2012 |
1045-v2 |
Discussion of Magnet R&D Plan |
Peter Wanderer |
General
|
11 Nov 2009 |
1007-v1 |
Magnet Systems 5 Year Plan |
Peter Wanderer |
Magnets
Magnet R&D
|
03 Nov 2009 |
989-v1 |
Magnet Systems Q&A |
Peter Wanderer |
Magnet R&D
|
14 Jul 2009 |
981-v1 |
Planning, Budget, and Decision Points |
Peter Wanderer |
Program Management
General
IRUpgrades
|
13 Jul 2009 |
982-v1 |
Magnet Systems Status |
Peter Wanderer |
General
|
13 Jul 2009 |
961-v1 |
Magnet Systems 5-Year Plan |
Peter Wanderer |
General
|
10 Apr 2009 |
917-v1 |
Magnet Systems status |
Peter Wanderer |
General
|
08 Apr 2009 |
904-v1 |
Magnet System |
Peter Wanderer |
Magnet R&D
|
14 Jan 2009 |
905-v1 |
Accelerator Projects for the Upgrade of the LHC (APUL) |
Peter Wanderer |
Program Management
|
14 Jan 2009 |
868-v1 |
Magnet R&D Status |
Peter Wanderer |
General
Magnet R&D
|
05 Nov 2008 |
806-v4 |
Annual Report |
Thomas Markiewicz et al. |
Program Management
|
19 Jun 2008 |
805-v1 |
Beam separation dipoles for LHC |
Peter Wanderer |
General
IRUpgrades
|
17 Jun 2008 |
803-v1 |
Summary: Magnet Systems |
Peter Wanderer |
Magnets
|
17 Jun 2008 |
802-v1 |
LAUC Proposal |
Mike Anerella et al. |
LHC
|
17 Jun 2008 |
721-v1 |
Inner Triplet Dipoles |
Peter Wanderer |
General
|
22 Apr 2008 |
720-v1 |
Magnet Feasibility Studies |
Peter Wanderer |
Magnets
|
22 Apr 2008 |
719-v1 |
Magnet Progress Report |
Peter Wanderer |
General
|
22 Apr 2008 |
679-v2 |
Summary of magnet quench tests |
Peter Wanderer |
General
|
28 Nov 2007 |
664-v1 |
Summary of Magnet Discussions |
Peter Wanderer |
General
|
19 Oct 2007 |
615-v1 |
Magnet feasibility study |
Peter Wanderer |
General
IRUpgrades
Magnet R&D
|
18 Oct 2007 |
339-v0 |
Fast ramped magnet |
Peter Wanderer |
TaskSheets
|
16 Jun 2006 |
307-v0 |
Short Racetrack Test Fixture SRK Task Sheet FY07 |
Peter Wanderer |
TaskSheets
|
02 Jun 2006 |
255-v0 |
FY07 Task Sheet for 2.1.4.3 Interaction Region Magnet Study |
Peter Wanderer |
TaskSheets
|
02 Jun 2006 |
303-v3 |
Fast Ramped Magnet Measurement Task Sheet FY07 |
Peter Wanderer |
TaskSheets
General
|
30 Jun 2006 |
325-v2 |
Nearterm LR Plans and Details |
Peter Wanderer |
General
Magnet R&D
|
13 Jun 2006 |
226-v1 |
New task under LR work |
Peter Wanderer |
General
Magnet R&D
|
24 May 2006 |
163-v2 |
IR Magnets Design Studies |
Peter Wanderer |
General
|
24 May 2006 |